RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032448 - Archived data from Tue, 06. October 2020 18:29:24 CEST


This is all the information about APD 2901032448. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032448
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 43
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5408992 V     T = -25 °C: 348.8607501 V
Voltage for Gain 150: T = +20 °C: 392.4304925 V     T = -25 °C: 356.3414394 V
Voltage for Gain 200: T = +20 °C: 396.8044724 V     T = -25 °C: 360.4889293 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.378699614 V-1     T = -25 °C: 4.848042664 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.358371572 V-1     T = -25 °C: 9.192972857 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56293769 V-1     T = -25 °C: 16.52885206 V-1
Break-through voltage: T = +20 °C: 412.0017239 V     T = -25 °C: 375.64701 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:53:46 CET jreher Updated box and position via API.
03. Feb 2021 18:19:33 CET jreher Updated box and position via API.
07. Oct 2020 15:46:02 CEST jreher Updated APD location via API.
06. Oct 2020 18:30:56 CEST jreher
06. Oct 2020 18:29:24 CEST jreher
11. Aug 2020 17:26:46 CEST jreher Updated APD characteristics via API.
29. Nov 2019 10:57:23 CET jreher Updated APD location via API.
27. Nov 2019 19:36:39 CET jreher Updated APD location via API.
25. Nov 2019 17:18:57 CET jreher Updated box and position via API.
25. Nov 2019 17:14:22 CET jreher Updated box and position via API.
04. Jul 2019 11:11:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
21. Aug 2018 12:06:17 CEST markus.moritz
20. Jun 2018 13:36:34 CEST Tobias Imported from Hamamatsu datasheet.