RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032427 - Archived data from Mon, 17. May 2021 09:16:18 CEST


This is all the information about APD 2820032427. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032427
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 48
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.8914919 V     T = -25 °C: 342.8774159 V
Voltage for Gain 150: T = +20 °C: 385.6840494 V     T = -25 °C: 350.1927936 V
Voltage for Gain 200: T = +20 °C: 390.0210744 V     T = -25 °C: 354.3082909 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.693094504 V-1     T = -25 °C: 5.029723912 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.312672633 V-1     T = -25 °C: 9.420557661 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55702135 V-1     T = -25 °C: 14.84541616 V-1
Break-through voltage: T = +20 °C: 405.852854 V     T = -25 °C: 369.7584655 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:34 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:18 CET jreher Updated box and position via API.
11. Aug 2020 18:05:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:31 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:08 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:12 CET jreher Updated APD location via API.
28. Nov 2019 12:01:06 CET jreher Updated APD location via API.
25. Nov 2019 17:18:55 CET jreher Updated box and position via API.
20. Aug 2019 12:47:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:34 CEST Tobias Imported from Hamamatsu datasheet.