RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032412 - Archived data from Fri, 05. July 2019 13:49:48 CEST


This is all the information about APD 2820032412. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032412
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 98
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 13.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:34:20 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:22 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:16 CET jreher Updated box and position via API.
11. Aug 2020 18:05:30 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:30 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:10 CET jreher Updated APD location via API.
28. Nov 2019 12:01:05 CET jreher Updated APD location via API.
25. Nov 2019 17:18:54 CET jreher Updated box and position via API.
20. Aug 2019 12:46:45 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:34 CEST Tobias Imported from Hamamatsu datasheet.