RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032401 - Archived data from Tue, 11. August 2020 18:05:28 CEST


This is all the information about APD 2820032401. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032401
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 24
EP1 batch: 97
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7783694 V     T = -25 °C: 346.255442 V
Voltage for Gain 150: T = +20 °C: 389.5871866 V     T = -25 °C: 353.6417515 V
Voltage for Gain 200: T = +20 °C: 393.9087139 V     T = -25 °C: 357.7608022 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.723992978 V-1     T = -25 °C: 4.836215319 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.436810376 V-1     T = -25 °C: 9.923893176 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83874625 V-1     T = -25 °C: 15.86214077 V-1
Break-through voltage: T = +20 °C: 408.6819093 V     T = -25 °C: 372.4841156 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 15:53:28 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:35 CET jreher Updated box and position via API.
05. Feb 2021 11:01:15 CET jreher Updated box and position via API.
11. Aug 2020 18:05:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:29 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:10 CET jreher Updated APD location via API.
28. Nov 2019 12:01:04 CET jreher Updated APD location via API.
25. Nov 2019 17:18:54 CET jreher Updated box and position via API.
20. Aug 2019 12:46:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.