RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032399 - Archived data from Wed, 16. June 2021 16:00:12 CEST


This is all the information about APD 2820032399. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032399
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 22
EP1 batch: 97
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6144275 V     T = -25 °C: 346.0814956 V
Voltage for Gain 150: T = +20 °C: 389.3897194 V     T = -25 °C: 353.4522098 V
Voltage for Gain 200: T = +20 °C: 393.7174635 V     T = -25 °C: 357.5846476 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458671379 V-1     T = -25 °C: 4.926713235 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.805586632 V-1     T = -25 °C: 9.212379409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55137072 V-1     T = -25 °C: 14.58612638 V-1
Break-through voltage: T = +20 °C: 408.5561307 V     T = -25 °C: 372.4048195 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:51 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:57 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:12 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:15 CET jreher Updated box and position via API.
11. Aug 2020 18:05:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:29 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:09 CET jreher Updated APD location via API.
28. Nov 2019 12:01:04 CET jreher Updated APD location via API.
25. Nov 2019 17:18:53 CET jreher Updated box and position via API.
20. Aug 2019 12:46:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.