RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2820032386 - Archived data from Mon, 10. May 2021 14:00:45 CEST


This is all the information about APD 2820032386. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2820032386
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 100
Position in Box: 11
EP1 batch: 96
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.2056021 V     T = -25 °C: 350.295467 V
Voltage for Gain 150: T = +20 °C: 394.1102778 V     T = -25 °C: 357.8244572 V
Voltage for Gain 200: T = +20 °C: 398.5163797 V     T = -25 °C: 362.0512332 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.496621703 V-1     T = -25 °C: 4.705291488 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.801681885 V-1     T = -25 °C: 9.38348352 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30407491 V-1     T = -25 °C: 14.72054875 V-1
Break-through voltage: T = +20 °C: 413.5070575 V     T = -25 °C: 377.2804499 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:34 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:45 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:14 CET jreher Updated box and position via API.
11. Aug 2020 18:05:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:28 CEST jreher Updated APD location via API.
20. Feb 2020 14:50:09 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:08 CET jreher Updated APD location via API.
28. Nov 2019 12:01:03 CET jreher Updated APD location via API.
25. Nov 2019 17:18:53 CET jreher Updated box and position via API.
20. Aug 2019 12:46:08 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:06 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:33 CEST Tobias Imported from Hamamatsu datasheet.