RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2819032343 - Archived data from Fri, 05. February 2021 11:01:09 CET


This is all the information about APD 2819032343. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2819032343
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 99
Position in Box: 34
EP1 batch: 96
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1166559 V     T = -25 °C: 344.0297902 V
Voltage for Gain 150: T = +20 °C: 386.959867 V     T = -25 °C: 351.4048999 V
Voltage for Gain 200: T = +20 °C: 391.3406953 V     T = -25 °C: 355.5232109 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.553628442 V-1     T = -25 °C: 4.906641424 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.901251092 V-1     T = -25 °C: 9.040087238 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.48837908 V-1     T = -25 °C: 15.9895696 V-1
Break-through voltage: T = +20 °C: 407.1612297 V     T = -25 °C: 370.9534077 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:20:50 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:41 CET jreher Updated box and position via API.
05. Feb 2021 11:01:09 CET jreher Updated box and position via API.
11. Aug 2020 18:05:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:36 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:51:02 CET jreher Updated APD location via API.
28. Nov 2019 12:01:23 CET jreher Updated APD location via API.
25. Nov 2019 17:18:50 CET jreher Updated box and position via API.
20. Aug 2019 12:46:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:05 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:32 CEST Tobias Imported from Hamamatsu datasheet.