RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033079 - Archived data from Tue, 11. August 2020 18:05:15 CEST


This is all the information about APD 2909033079. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033079
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 50
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4886401 V     T = -25 °C: 349.9270244 V
Voltage for Gain 150: T = +20 °C: 393.3076829 V     T = -25 °C: 357.3799315 V
Voltage for Gain 200: T = +20 °C: 397.6384925 V     T = -25 °C: 361.5472803 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437635532 V-1     T = -25 °C: 4.926784625 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.762802665 V-1     T = -25 °C: 9.076425164 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32861062 V-1     T = -25 °C: 16.13510211 V-1
Break-through voltage: T = +20 °C: 411.5658879 V     T = -25 °C: 376.2761135 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:03 CET jreher Updated box and position via API.
11. Aug 2020 18:05:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:33 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:59 CET jreher Updated APD location via API.
27. Nov 2019 19:46:20 CET jreher Updated APD location via API.
25. Nov 2019 17:18:47 CET jreher Updated box and position via API.
24. Oct 2019 12:37:36 CEST spankonin Updated APD location via API.
20. Aug 2019 12:44:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:04 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:31 CEST Tobias Imported from Hamamatsu datasheet.