RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033076 - Archived data from Fri, 05. February 2021 11:01:03 CET


This is all the information about APD 2909033076. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033076
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 13.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 48
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8143281 V     T = -25 °C: 343.6790246 V
Voltage for Gain 150: T = +20 °C: 386.6655169 V     T = -25 °C: 351.0264479 V
Voltage for Gain 200: T = +20 °C: 391.0410848 V     T = -25 °C: 355.1650294 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660743911 V-1     T = -25 °C: 4.696132121 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.274324019 V-1     T = -25 °C: 9.448334083 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40676354 V-1     T = -25 °C: 15.05516734 V-1
Break-through voltage: T = +20 °C: 406.9854935 V     T = -25 °C: 370.6976417 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:30:16 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:57 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:03 CET jreher Updated box and position via API.
11. Aug 2020 18:05:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:32 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:59 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:59 CET jreher Updated APD location via API.
27. Nov 2019 19:46:20 CET jreher Updated APD location via API.
25. Nov 2019 17:18:46 CET jreher Updated box and position via API.
24. Oct 2019 12:37:36 CEST spankonin Updated APD location via API.
20. Aug 2019 12:44:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:04 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:31 CEST Tobias Imported from Hamamatsu datasheet.