RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033075 - Archived data from Tue, 11. August 2020 18:06:01 CEST


This is all the information about APD 2909033075. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033075
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 50
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.2609545 V     T = -25 °C: 348.2838269 V
Voltage for Gain 150: T = +20 °C: 392.0724342 V     T = -25 °C: 355.7265582 V
Voltage for Gain 200: T = +20 °C: 396.4233322 V     T = -25 °C: 359.8864369 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523329792 V-1     T = -25 °C: 4.747367704 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.903211337 V-1     T = -25 °C: 9.666033911 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.67839966 V-1     T = -25 °C: 15.29536589 V-1
Break-through voltage: T = +20 °C: 411.2524753 V     T = -25 °C: 374.8425195 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:57 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:12 CET jreher Updated box and position via API.
11. Aug 2020 18:06:01 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:02 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:13 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:43 CET jreher Updated APD location via API.
25. Nov 2019 17:19:29 CET jreher Updated box and position via API.
23. Aug 2019 11:59:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:04 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.