RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033066 - Archived data from Fri, 05. February 2021 11:02:12 CET


This is all the information about APD 2909033066. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033066
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 42
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5416023 V     T = -25 °C: 346.7151615 V
Voltage for Gain 150: T = +20 °C: 390.397907 V     T = -25 °C: 354.1088233 V
Voltage for Gain 200: T = +20 °C: 394.7547984 V     T = -25 °C: 358.2598339 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391177598 V-1     T = -25 °C: 4.999043438 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.594944475 V-1     T = -25 °C: 9.314049149 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89354221 V-1     T = -25 °C: 14.69522275 V-1
Break-through voltage: T = +20 °C: 410.5609097 V     T = -25 °C: 373.7698085 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:24:19 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:12 CET jreher Updated box and position via API.
11. Aug 2020 18:05:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:12 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.