RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033064 - Archived data from Tue, 11. August 2020 18:05:59 CEST


This is all the information about APD 2909033064. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033064
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 41
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4457065 V     T = -25 °C: 342.9075751 V
Voltage for Gain 150: T = +20 °C: 386.2316924 V     T = -25 °C: 350.2263846 V
Voltage for Gain 200: T = +20 °C: 390.5691842 V     T = -25 °C: 354.3306444 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.488108393 V-1     T = -25 °C: 4.995951745 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.813589792 V-1     T = -25 °C: 9.376468252 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.49668262 V-1     T = -25 °C: 14.82571429 V-1
Break-through voltage: T = +20 °C: 405.9317371 V     T = -25 °C: 369.4150716 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
11. Aug 2020 18:05:59 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:12 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.