RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033063 - Archived data from Tue, 11. August 2020 18:05:58 CEST


This is all the information about APD 2909033063. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033063
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 40
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3202841 V     T = -25 °C: 344.8013672 V
Voltage for Gain 150: T = +20 °C: 387.1217369 V     T = -25 °C: 352.0600965 V
Voltage for Gain 200: T = +20 °C: 391.4775518 V     T = -25 °C: 356.1657541 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520006583 V-1     T = -25 °C: 5.024196742 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.908517938 V-1     T = -25 °C: 9.145759349 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.63711507 V-1     T = -25 °C: 16.11415566 V-1
Break-through voltage: T = +20 °C: 407.8421359 V     T = -25 °C: 370.1915647 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
11. Aug 2020 18:05:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:12 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.