RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033062 - Archived data from Fri, 05. February 2021 11:02:11 CET


This is all the information about APD 2909033062. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033062
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 39
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9193502 V     T = -25 °C: 345.7304665 V
Voltage for Gain 150: T = +20 °C: 388.7558981 V     T = -25 °C: 353.0741219 V
Voltage for Gain 200: T = +20 °C: 393.11876 V     T = -25 °C: 357.1961077 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633425498 V-1     T = -25 °C: 5.026686605 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163299963 V-1     T = -25 °C: 9.436763193 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27593075 V-1     T = -25 °C: 14.90884293 V-1
Break-through voltage: T = +20 °C: 408.0647526 V     T = -25 °C: 371.955523 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:23:00 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:14 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
11. Aug 2020 18:05:58 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:53 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:37 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:25 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.