RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033055 - Archived data from Tue, 11. August 2020 18:05:57 CEST


This is all the information about APD 2909033055. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033055
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 34
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9764872 V     T = -25 °C: 346.5496871 V
Voltage for Gain 150: T = +20 °C: 389.7951146 V     T = -25 °C: 353.9480255 V
Voltage for Gain 200: T = +20 °C: 394.1398254 V     T = -25 °C: 358.1023649 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.622940663 V-1     T = -25 °C: 4.692822858 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.174470359 V-1     T = -25 °C: 9.490610758 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31021855 V-1     T = -25 °C: 14.97651122 V-1
Break-through voltage: T = +20 °C: 408.966363 V     T = -25 °C: 372.9489394 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:35 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:11 CET jreher Updated box and position via API.
18. Dec 2020 13:59:40 CET jreher Updated box and position via API.
11. Aug 2020 18:05:57 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:00 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:52 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:36 CET jreher Updated APD location via API.
27. Nov 2019 19:47:42 CET jreher Updated APD location via API.
25. Nov 2019 17:19:28 CET jreher Updated box and position via API.
23. Aug 2019 11:59:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.