RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2909033049 - Archived data from Mon, 17. May 2021 09:16:18 CEST


This is all the information about APD 2909033049. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2909033049
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 28
EP1 batch: 109
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.997046 V     T = -25 °C: 342.8118063 V
Voltage for Gain 150: T = +20 °C: 385.8283309 V     T = -25 °C: 350.1577305 V
Voltage for Gain 200: T = +20 °C: 390.1964141 V     T = -25 °C: 354.2920777 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.62414171 V-1     T = -25 °C: 5.017714344 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.119092013 V-1     T = -25 °C: 9.352995045 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.14113133 V-1     T = -25 °C: 14.71707444 V-1
Break-through voltage: T = +20 °C: 405.8932613 V     T = -25 °C: 369.5623008 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:38 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:10 CET jreher Updated box and position via API.
11. Aug 2020 18:05:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:00 CEST jreher Updated APD location via API.
20. Feb 2020 15:18:52 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:36 CET jreher Updated APD location via API.
27. Nov 2019 19:47:41 CET jreher Updated APD location via API.
25. Nov 2019 17:19:27 CET jreher Updated box and position via API.
23. Aug 2019 11:59:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:03 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:30 CEST Tobias Imported from Hamamatsu datasheet.