RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033021 - Archived data from Fri, 05. February 2021 11:02:07 CET


This is all the information about APD 2908033021. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033021
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 6
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7394993 V     T = -25 °C: 346.3983084 V
Voltage for Gain 150: T = +20 °C: 389.6152876 V     T = -25 °C: 353.8313483 V
Voltage for Gain 200: T = +20 °C: 393.9794648 V     T = -25 °C: 358.025036 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.635128817 V-1     T = -25 °C: 4.861553123 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.288107303 V-1     T = -25 °C: 9.497158025 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55289263 V-1     T = -25 °C: 14.95972555 V-1
Break-through voltage: T = +20 °C: 409.2045809 V     T = -25 °C: 373.2109337 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:04 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:12:27 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:07 CET jreher Updated box and position via API.
11. Aug 2020 18:05:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:58 CEST jreher Updated APD location via API.
20. Feb 2020 15:16:07 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:39 CET jreher Updated APD location via API.
25. Nov 2019 17:19:25 CET jreher Updated box and position via API.
23. Aug 2019 11:59:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.