RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033016 - Archived data from Tue, 11. August 2020 18:05:50 CEST


This is all the information about APD 2908033016. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033016
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 107
Position in Box: 1
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6995946 V     T = -25 °C: 345.4690061 V
Voltage for Gain 150: T = +20 °C: 388.642934 V     T = -25 °C: 352.8760425 V
Voltage for Gain 200: T = +20 °C: 393.0371301 V     T = -25 °C: 357.055986 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.396256335 V-1     T = -25 °C: 4.760509912 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.291602762 V-1     T = -25 °C: 9.754180491 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25793353 V-1     T = -25 °C: 15.02697018 V-1
Break-through voltage: T = +20 °C: 408.8076604 V     T = -25 °C: 372.516761 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:06 CET jreher Updated box and position via API.
11. Aug 2020 18:05:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:57 CEST jreher Updated APD location via API.
20. Feb 2020 15:16:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:39 CET jreher Updated APD location via API.
25. Nov 2019 17:19:25 CET jreher Updated box and position via API.
23. Aug 2019 11:59:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.