RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033015 - Archived data from Wed, 16. June 2021 16:03:09 CEST


This is all the information about APD 2908033015. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033015
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 50
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7959286 V     T = -25 °C: 343.3329277 V
Voltage for Gain 150: T = +20 °C: 386.5794319 V     T = -25 °C: 350.6653847 V
Voltage for Gain 200: T = +20 °C: 390.9013049 V     T = -25 °C: 354.7700919 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.099124863 V-1     T = -25 °C: 4.834488663 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.390615183 V-1     T = -25 °C: 9.925921399 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05372151 V-1     T = -25 °C: 15.86696019 V-1
Break-through voltage: T = +20 °C: 405.2587667 V     T = -25 °C: 369.2672005 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:14 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:09 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:34 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:04 CET jreher Updated box and position via API.
11. Aug 2020 18:00:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:57 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:32 CET jreher Updated APD location via API.
25. Nov 2019 17:19:24 CET jreher Updated box and position via API.
23. Aug 2019 11:59:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.