RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033013 - Archived data from Tue, 11. August 2020 18:00:12 CEST


This is all the information about APD 2908033013. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033013
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 48
EP1 batch: 108
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2496918 V     T = -25 °C: 344.4363175 V
Voltage for Gain 150: T = +20 °C: 387.9749114 V     T = -25 °C: 351.8280727 V
Voltage for Gain 200: T = +20 °C: 392.2912378 V     T = -25 °C: 355.9790769 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.978989598 V-1     T = -25 °C: 4.758346365 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.156415837 V-1     T = -25 °C: 9.642374166 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91262569 V-1     T = -25 °C: 15.36628201 V-1
Break-through voltage: T = +20 °C: 407.4580038 V     T = -25 °C: 371.2819084 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:56:28 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:11 CET jreher Updated box and position via API.
05. Feb 2021 11:02:04 CET jreher Updated box and position via API.
11. Aug 2020 18:00:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:57 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:21 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:34 CET jreher Updated APD location via API.
27. Nov 2019 19:47:31 CET jreher Updated APD location via API.
25. Nov 2019 17:19:24 CET jreher Updated box and position via API.
23. Aug 2019 11:59:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:29 CEST Tobias Imported from Hamamatsu datasheet.