RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908033005 - Archived data from Fri, 05. February 2021 11:02:03 CET


This is all the information about APD 2908033005. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908033005
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 40
EP1 batch: 107
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6880228 V     T = -25 °C: 349.5648553 V
Voltage for Gain 150: T = +20 °C: 393.5221784 V     T = -25 °C: 357.0724199 V
Voltage for Gain 200: T = +20 °C: 397.807772 V     T = -25 °C: 361.2957254 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.716581752 V-1     T = -25 °C: 4.598726307 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.458010329 V-1     T = -25 °C: 9.236755376 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02115072 V-1     T = -25 °C: 14.44752214 V-1
Break-through voltage: T = +20 °C: 412.8284591 V     T = -25 °C: 376.6284851 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 18:52:04 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:39 CET jreher Updated box and position via API.
05. Feb 2021 11:02:03 CET jreher Updated box and position via API.
11. Aug 2020 18:00:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:56 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:33 CET jreher Updated APD location via API.
27. Nov 2019 19:47:31 CET jreher Updated APD location via API.
25. Nov 2019 17:19:23 CET jreher Updated box and position via API.
23. Aug 2019 11:58:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:28 CEST Tobias Imported from Hamamatsu datasheet.