RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908032998 - Archived data from Tue, 11. August 2020 18:00:09 CEST


This is all the information about APD 2908032998. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908032998
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 23.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 35
EP1 batch: 107
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9385899 V     T = -25 °C: 346.0776186 V
Voltage for Gain 150: T = +20 °C: 388.7256569 V     T = -25 °C: 353.5253821 V
Voltage for Gain 200: T = +20 °C: 392.9935064 V     T = -25 °C: 357.6280243 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.534277053 V-1     T = -25 °C: 4.661143806 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.368874544 V-1     T = -25 °C: 9.40532872 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80139496 V-1     T = -25 °C: 14.53854941 V-1
Break-through voltage: T = +20 °C: 406.1369457 V     T = -25 °C: 370.7361522 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:03 CET jreher Updated box and position via API.
11. Aug 2020 18:00:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:56 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:33 CET jreher Updated APD location via API.
27. Nov 2019 19:47:30 CET jreher Updated APD location via API.
25. Nov 2019 17:19:23 CET jreher Updated box and position via API.
23. Aug 2019 11:58:38 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:47 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:02 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:28 CEST Tobias Imported from Hamamatsu datasheet.