RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908032986 - Archived data from Fri, 18. December 2020 13:59:24 CET


This is all the information about APD 2908032986. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908032986
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 23
EP1 batch: 107
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7795595 V     T = -25 °C: 344.8717413 V
Voltage for Gain 150: T = +20 °C: 388.5684994 V     T = -25 °C: 352.2435207 V
Voltage for Gain 200: T = +20 °C: 392.8726413 V     T = -25 °C: 356.3828242 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.615983165 V-1     T = -25 °C: 4.971306124 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.620042619 V-1     T = -25 °C: 9.272028466 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02589109 V-1     T = -25 °C: 14.63699722 V-1
Break-through voltage: T = +20 °C: 408.3831757 V     T = -25 °C: 371.7967902 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:20:58 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:01 CET jreher Updated box and position via API.
18. Dec 2020 13:59:24 CET jreher Updated box and position via API.
11. Aug 2020 18:00:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:55 CEST jreher Updated APD location via API.
28. Jan 2020 15:39:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:32 CET jreher Updated APD location via API.
27. Nov 2019 19:47:30 CET jreher Updated APD location via API.
25. Nov 2019 17:19:22 CET jreher Updated box and position via API.
23. Aug 2019 11:58:37 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:01 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:28 CEST Tobias Imported from Hamamatsu datasheet.