RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908032980 - Archived data from Thu, 03. January 2019 00:14:01 CET


This is all the information about APD 2908032980. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908032980
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 106
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:00 CET jreher Updated box and position via API.
11. Aug 2020 18:00:05 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:54 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:14 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:31 CET jreher Updated APD location via API.
27. Nov 2019 19:47:29 CET jreher Updated APD location via API.
25. Nov 2019 17:19:22 CET jreher Updated box and position via API.
23. Aug 2019 11:58:37 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:46 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:01 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:27 CEST Tobias Imported from Hamamatsu datasheet.