RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2908032975


This is all the information about APD 2908032975. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2908032975
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2907032927/2908032975
Unit: #1841 (barcode 1309019465)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 106
Position in Box: 13
EP1 batch: 107
EP1 batch after irradiation: 10396
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1105295 V     T = -25 °C: 343.8138062 V
Voltage for Gain 150: T = +20 °C: 386.9012247 V     T = -25 °C: 351.1479176 V
Voltage for Gain 200: T = +20 °C: 391.2412754 V     T = -25 °C: 355.2632691 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.617538002 V-1     T = -25 °C: 5.032953311 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.135028156 V-1     T = -25 °C: 9.473921551 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.30904634 V-1     T = -25 °C: 15.02867227 V-1
Break-through voltage: T = +20 °C: 406.5485244 V     T = -25 °C: 370.3419236 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
15. Feb 2021 15:39:33 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:00 CET jreher Updated box and position via API.
18. Dec 2020 14:01:05 CET jreher Updated box and position via API.
11. Aug 2020 18:00:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:54 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:13 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:31 CET jreher Updated APD location via API.
27. Nov 2019 19:47:29 CET jreher Updated APD location via API.
25. Nov 2019 17:19:21 CET jreher Updated box and position via API.
23. Aug 2019 11:58:36 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:45 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:01 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:27 CEST Tobias Imported from Hamamatsu datasheet.