RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032928 - Archived data from Thu, 15. April 2021 17:01:20 CEST


This is all the information about APD 2907032928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 13.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 47
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8833709 V     T = -25 °C: 343.6095991 V
Voltage for Gain 150: T = +20 °C: 386.6795721 V     T = -25 °C: 350.9522369 V
Voltage for Gain 200: T = +20 °C: 391.0074201 V     T = -25 °C: 355.0702705 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.695432665 V-1     T = -25 °C: 4.741374957 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.325051026 V-1     T = -25 °C: 9.624808381 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.66834165 V-1     T = -25 °C: 15.26348359 V-1
Break-through voltage: T = +20 °C: 406.8660471 V     T = -25 °C: 370.6513613 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:01:53 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:20 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:56 CET jreher Updated box and position via API.
11. Aug 2020 18:00:01 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:30 CET jreher Updated APD location via API.
27. Nov 2019 19:47:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:19 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:01 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:27 CEST Tobias Imported from Hamamatsu datasheet.