RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032924 - Archived data from Fri, 05. February 2021 11:01:56 CET


This is all the information about APD 2907032924. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032924
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 49
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2910666 V     T = -25 °C: 344.1376179 V
Voltage for Gain 150: T = +20 °C: 387.1101278 V     T = -25 °C: 351.4577012 V
Voltage for Gain 200: T = +20 °C: 391.478259 V     T = -25 °C: 355.5578782 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.54492726 V-1     T = -25 °C: 4.907730914 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.932848905 V-1     T = -25 °C: 9.120044961 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86385302 V-1     T = -25 °C: 16.50305802 V-1
Break-through voltage: T = +20 °C: 407.4841935 V     T = -25 °C: 371.0763617 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:56 CET jreher Updated box and position via API.
11. Aug 2020 18:00:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:29 CET jreher Updated APD location via API.
27. Nov 2019 19:47:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:19 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.