Show Hamamatsu Avalanche Photo Diode 2907032922 - Archived data from Tue, 11. August 2020 18:00:00 CEST


This is all the information about APD 2907032922. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032922
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 12.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 41
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.088741 V     T = -25 °C: 344.7572184 V
Voltage for Gain 150: T = +20 °C: 387.9452392 V     T = -25 °C: 352.1319124 V
Voltage for Gain 200: T = +20 °C: 392.3320582 V     T = -25 °C: 356.2810382 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587106501 V-1     T = -25 °C: 5.038642679 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.036065468 V-1     T = -25 °C: 9.370312256 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96069261 V-1     T = -25 °C: 14.81391633 V-1
Break-through voltage: T = +20 °C: 408.0213967 V     T = -25 °C: 371.652781 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:57 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:55 CET jreher Updated box and position via API.
18. Dec 2020 14:00:06 CET jreher Updated box and position via API.
11. Aug 2020 18:00:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD location via API.
28. Jan 2020 15:35:12 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:29 CET jreher Updated APD location via API.
27. Nov 2019 19:47:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.