RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032921 - Archived data from Fri, 05. February 2021 11:01:55 CET


This is all the information about APD 2907032921. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032921
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 11 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 48
EP1 batch: 106
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1390363 V     T = -25 °C: 345.9533131 V
Voltage for Gain 150: T = +20 °C: 388.9726401 V     T = -25 °C: 353.3561073 V
Voltage for Gain 200: T = +20 °C: 393.3436039 V     T = -25 °C: 357.5050822 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570540139 V-1     T = -25 °C: 4.967722093 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.02976471 V-1     T = -25 °C: 9.152737603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96777222 V-1     T = -25 °C: 16.39599119 V-1
Break-through voltage: T = +20 °C: 408.5661049 V     T = -25 °C: 372.5165908 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:55 CET jreher Updated box and position via API.
11. Aug 2020 18:00:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:29 CET jreher Updated APD location via API.
27. Nov 2019 19:47:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:19 CET jreher Updated box and position via API.
23. Aug 2019 11:58:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.