RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032899 - Archived data from Tue, 11. August 2020 17:59:56 CEST


This is all the information about APD 2907032899. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032899
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 25
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1262175 V     T = -25 °C: 346.399258 V
Voltage for Gain 150: T = +20 °C: 389.9296274 V     T = -25 °C: 353.7897232 V
Voltage for Gain 200: T = +20 °C: 394.2860927 V     T = -25 °C: 357.9263021 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55241551 V-1     T = -25 °C: 4.725777989 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.955537574 V-1     T = -25 °C: 9.572256368 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.69111509 V-1     T = -25 °C: 15.1952429 V-1
Break-through voltage: T = +20 °C: 409.6051729 V     T = -25 °C: 373.1345697 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:40:59 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:21 CET jreher Updated box and position via API.
05. Feb 2021 11:01:53 CET jreher Updated box and position via API.
11. Aug 2020 17:59:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:50 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:28 CET jreher Updated APD location via API.
27. Nov 2019 19:47:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:18 CET jreher Updated box and position via API.
23. Aug 2019 11:58:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.