RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032898 - Archived data from Mon, 15. February 2021 15:40:00 CET


This is all the information about APD 2907032898. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032898
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2907032898/3210035207
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 105
Position in Box: 24
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9083825 V     T = -25 °C: 347.7542439 V
Voltage for Gain 150: T = +20 °C: 390.7502681 V     T = -25 °C: 355.1447973 V
Voltage for Gain 200: T = +20 °C: 395.1123587 V     T = -25 °C: 359.3141721 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.650177748 V-1     T = -25 °C: 4.326972756 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.167303941 V-1     T = -25 °C: 9.049895458 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34072662 V-1     T = -25 °C: 14.45982901 V-1
Break-through voltage: T = +20 °C: 410.7717866 V     T = -25 °C: 374.1964875 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:44 CET jreher Updated box and position via API.
15. Feb 2021 15:40:00 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:53 CET jreher Updated box and position via API.
11. Aug 2020 17:59:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:50 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:28 CET jreher Updated APD location via API.
27. Nov 2019 19:47:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:17 CET jreher Updated box and position via API.
23. Aug 2019 11:58:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:26 CEST Tobias Imported from Hamamatsu datasheet.