RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2907032894 - Archived data from Tue, 11. August 2020 17:59:55 CEST


This is all the information about APD 2907032894. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2907032894
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 21
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4434037 V     T = -25 °C: 346.8416786 V
Voltage for Gain 150: T = +20 °C: 390.2411463 V     T = -25 °C: 354.2507202 V
Voltage for Gain 200: T = +20 °C: 394.5771157 V     T = -25 °C: 358.4045425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480920651 V-1     T = -25 °C: 4.944645549 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.784301905 V-1     T = -25 °C: 9.194594981 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39266389 V-1     T = -25 °C: 16.46269458 V-1
Break-through voltage: T = +20 °C: 409.3579456 V     T = -25 °C: 373.2187248 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:00 CET jreher Updated box and position via API.
15. Feb 2021 15:37:19 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:53 CET jreher Updated box and position via API.
11. Aug 2020 17:59:55 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:50 CEST jreher Updated APD location via API.
28. Jan 2020 15:23:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:27 CET jreher Updated APD location via API.
27. Nov 2019 19:47:18 CET jreher Updated APD location via API.
25. Nov 2019 17:19:17 CET jreher Updated box and position via API.
23. Aug 2019 11:58:00 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:38 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:00 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:25 CEST Tobias Imported from Hamamatsu datasheet.