RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032878 - Archived data from Fri, 23. August 2019 11:57:59 CEST


This is all the information about APD 2906032878. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032878
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 105
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 105
Position in Box: 8
EP1 batch: 105
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:49 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:46 CET jreher Updated box and position via API.
05. Feb 2021 11:01:51 CET jreher Updated box and position via API.
11. Aug 2020 17:59:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:49 CEST jreher Updated APD location via API.
28. Jan 2020 15:22:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:27 CET jreher Updated APD location via API.
27. Nov 2019 19:47:17 CET jreher Updated APD location via API.
25. Nov 2019 17:19:16 CET jreher Updated box and position via API.
23. Aug 2019 11:57:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:37 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:59 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:25 CEST Tobias Imported from Hamamatsu datasheet.