RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032834 - Archived data from Fri, 05. February 2021 11:01:45 CET


This is all the information about APD 2906032834. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032834
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 22
EP1 batch: 104
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2952596 V     T = -25 °C: 345.0180043 V
Voltage for Gain 150: T = +20 °C: 388.1840309 V     T = -25 °C: 352.4439456 V
Voltage for Gain 200: T = +20 °C: 392.5818617 V     T = -25 °C: 356.6167762 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.465981726 V-1     T = -25 °C: 4.915147069 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.765366704 V-1     T = -25 °C: 9.037555055 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26136228 V-1     T = -25 °C: 16.00844711 V-1
Break-through voltage: T = +20 °C: 408.1749841 V     T = -25 °C: 372.3876579 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:44:23 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:19 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:45 CET jreher Updated box and position via API.
11. Aug 2020 17:59:46 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:46 CEST jreher Updated APD location via API.
28. Jan 2020 14:57:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:24 CET jreher Updated APD location via API.
27. Nov 2019 19:47:08 CET jreher Updated APD location via API.
25. Nov 2019 17:19:13 CET jreher Updated box and position via API.
23. Aug 2019 11:57:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:58 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:23 CEST Tobias Imported from Hamamatsu datasheet.