RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2906032829 - Archived data from Tue, 11. August 2020 17:59:45 CEST


This is all the information about APD 2906032829. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2906032829
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 13.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 104
Position in Box: 18
EP1 batch: 104
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6678806 V     T = -25 °C: 344.2266107 V
Voltage for Gain 150: T = +20 °C: 387.4992116 V     T = -25 °C: 351.6027694 V
Voltage for Gain 200: T = +20 °C: 391.8395674 V     T = -25 °C: 355.7312145 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.696181689 V-1     T = -25 °C: 4.813041431 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.390151737 V-1     T = -25 °C: 9.848276154 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73377069 V-1     T = -25 °C: 15.61662617 V-1
Break-through voltage: T = +20 °C: 407.2258971 V     T = -25 °C: 370.838558 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:45 CET jreher Updated box and position via API.
11. Aug 2020 17:59:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:45 CEST jreher Updated APD location via API.
28. Jan 2020 14:57:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:24 CET jreher Updated APD location via API.
27. Nov 2019 19:47:07 CET jreher Updated APD location via API.
25. Nov 2019 17:19:12 CET jreher Updated box and position via API.
23. Aug 2019 11:57:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:30 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:58 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:23 CEST Tobias Imported from Hamamatsu datasheet.