RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2905032803 - Archived data from Thu, 15. April 2021 17:01:27 CEST


This is all the information about APD 2905032803. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2905032803
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 103
Position in Box: 46
EP1 batch: 102
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4762241 V     T = -25 °C: 347.0486331 V
Voltage for Gain 150: T = +20 °C: 390.2909461 V     T = -25 °C: 354.4729478 V
Voltage for Gain 200: T = +20 °C: 394.6230866 V     T = -25 °C: 358.6241817 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461750165 V-1     T = -25 °C: 4.8422143 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.652875896 V-1     T = -25 °C: 9.865178302 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00797472 V-1     T = -25 °C: 15.5865258 V-1
Break-through voltage: T = +20 °C: 409.6500088 V     T = -25 °C: 373.7036323 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:11:28 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:27 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:41 CET jreher Updated box and position via API.
11. Aug 2020 17:59:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:43 CEST jreher Updated APD location via API.
21. Jul 2020 13:42:33 CEST jreher Updated APD batch assignment via API.
28. Jan 2020 14:54:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:22 CET jreher Updated APD location via API.
27. Nov 2019 19:46:58 CET jreher Updated APD location via API.
25. Nov 2019 17:19:10 CET jreher Updated box and position via API.
20. Aug 2019 12:48:55 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:58 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:22 CEST Tobias Imported from Hamamatsu datasheet.