RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2905032768 - Archived data from Fri, 05. July 2019 13:50:21 CEST


This is all the information about APD 2905032768. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2905032768
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 103
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 103
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:56:32 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:10 CET jreher Updated box and position via API.
05. Feb 2021 11:01:37 CET jreher Updated box and position via API.
11. Aug 2020 17:59:34 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:40 CEST jreher Updated APD location via API.
28. Jan 2020 14:54:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:19 CET jreher Updated APD location via API.
27. Nov 2019 19:46:56 CET jreher Updated APD location via API.
25. Nov 2019 17:19:07 CET jreher Updated box and position via API.
20. Aug 2019 12:48:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:57 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:21 CEST Tobias Imported from Hamamatsu datasheet.