RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2905032765 - Archived data from Fri, 05. February 2021 11:01:36 CET


This is all the information about APD 2905032765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2905032765
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 103
Position in Box: 10
EP1 batch: 101
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4316629 V     T = -25 °C: 346.0231797 V
Voltage for Gain 150: T = +20 °C: 389.2458894 V     T = -25 °C: 353.4317978 V
Voltage for Gain 200: T = +20 °C: 393.5819865 V     T = -25 °C: 357.5806546 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5076156 V-1     T = -25 °C: 4.910447758 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.805236763 V-1     T = -25 °C: 9.114422094 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53023284 V-1     T = -25 °C: 16.18984088 V-1
Break-through voltage: T = +20 °C: 408.7102989 V     T = -25 °C: 372.7024972 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:13 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:56 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:36 CET jreher Updated box and position via API.
11. Aug 2020 17:59:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:40 CEST jreher Updated APD location via API.
28. Jan 2020 14:54:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:19 CET jreher Updated APD location via API.
27. Nov 2019 19:46:55 CET jreher Updated APD location via API.
25. Nov 2019 17:19:07 CET jreher Updated box and position via API.
20. Aug 2019 12:48:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:21 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:57 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:21 CEST Tobias Imported from Hamamatsu datasheet.