RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032752 - Archived data from Mon, 10. May 2021 14:00:34 CEST


This is all the information about APD 2904032752. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032752
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.8 V
Dark current: 15.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 103
Position in Box: 2
EP1 batch: 100
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.9500589 V     T = -25 °C: 353.730903 V
Voltage for Gain 150: T = +20 °C: 397.7835898 V     T = -25 °C: 361.2732266 V
Voltage for Gain 200: T = +20 °C: 402.1328005 V     T = -25 °C: 365.5022528 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608690022 V-1     T = -25 °C: 4.892092185 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.153610749 V-1     T = -25 °C: 9.018257822 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32056245 V-1     T = -25 °C: 15.86038961 V-1
Break-through voltage: T = +20 °C: 417.435443 V     T = -25 °C: 380.9257153 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:49:39 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:35 CET jreher Updated box and position via API.
11. Aug 2020 17:59:32 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:39 CEST jreher Updated APD location via API.
28. Jan 2020 14:54:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:19 CET jreher Updated APD location via API.
27. Nov 2019 19:46:55 CET jreher Updated APD location via API.
25. Nov 2019 17:19:06 CET jreher Updated box and position via API.
20. Aug 2019 12:47:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:56 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:21 CEST Tobias Imported from Hamamatsu datasheet.