RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032750 - Archived data from Tue, 11. August 2020 18:05:15 CEST


This is all the information about APD 2904032750. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032750
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 388 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 47
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.5861808 V     T = -25 °C: 351.8261785 V
Voltage for Gain 150: T = +20 °C: 395.5180038 V     T = -25 °C: 359.3274569 V
Voltage for Gain 200: T = +20 °C: 399.8981418 V     T = -25 °C: 363.5311823 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.373720975 V-1     T = -25 °C: 4.89727444 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.483229284 V-1     T = -25 °C: 9.047082464 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.64085896 V-1     T = -25 °C: 15.93531532 V-1
Break-through voltage: T = +20 °C: 415.3546183 V     T = -25 °C: 379.0627346 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:07 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:14 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:01:03 CET jreher Updated box and position via API.
11. Aug 2020 18:05:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:32 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:59 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:59 CET jreher Updated APD location via API.
27. Nov 2019 19:46:20 CET jreher Updated APD location via API.
25. Nov 2019 17:18:46 CET jreher Updated box and position via API.
20. Aug 2019 12:44:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:56 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:21 CEST Tobias Imported from Hamamatsu datasheet.