RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032256 - Archived data from Tue, 11. August 2020 18:05:13 CEST


This is all the information about APD 2818032256. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032256
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 37
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2541878 V     T = -25 °C: 344.6401325 V
Voltage for Gain 150: T = +20 °C: 388.0273166 V     T = -25 °C: 351.9742092 V
Voltage for Gain 200: T = +20 °C: 392.3506455 V     T = -25 °C: 356.0837126 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.528139751 V-1     T = -25 °C: 5.048360162 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.915397593 V-1     T = -25 °C: 9.43944989 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.70110768 V-1     T = -25 °C: 15.01643755 V-1
Break-through voltage: T = +20 °C: 406.0800275 V     T = -25 °C: 369.8642866 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:01 CET jreher Updated box and position via API.
11. Aug 2020 18:05:13 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:31 CEST jreher Updated APD location via API.
17. Feb 2020 17:49:58 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:58 CET jreher Updated APD location via API.
27. Nov 2019 19:46:19 CET jreher Updated APD location via API.
25. Nov 2019 17:18:46 CET jreher Updated box and position via API.
20. Aug 2019 12:44:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:56 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:20 CEST Tobias Imported from Hamamatsu datasheet.