RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032234 - Archived data from Thu, 15. April 2021 17:01:06 CEST


This is all the information about APD 2818032234. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032234
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 21
EP1 batch: 94
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2996644 V     T = -25 °C: 344.2754721 V
Voltage for Gain 150: T = +20 °C: 387.1779759 V     T = -25 °C: 351.6730116 V
Voltage for Gain 200: T = +20 °C: 391.5724571 V     T = -25 °C: 355.8022392 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.51778997 V-1     T = -25 °C: 4.83176221 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.790594012 V-1     T = -25 °C: 9.863133356 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32100072 V-1     T = -25 °C: 15.71791066 V-1
Break-through voltage: T = +20 °C: 406.2546674 V     T = -25 °C: 370.2061196 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:20 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:06 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:59 CET jreher Updated box and position via API.
11. Aug 2020 18:05:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:30 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:28 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:57 CET jreher Updated APD location via API.
27. Nov 2019 19:46:18 CET jreher Updated APD location via API.
25. Nov 2019 17:18:44 CET jreher Updated box and position via API.
20. Aug 2019 12:44:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.