RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032224 - Archived data from Tue, 11. August 2020 18:05:08 CEST


This is all the information about APD 2818032224. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032224
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 13
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5713705 V     T = -25 °C: 343.4383348 V
Voltage for Gain 150: T = +20 °C: 386.4501469 V     T = -25 °C: 350.8157388 V
Voltage for Gain 200: T = +20 °C: 390.8360528 V     T = -25 °C: 354.9495456 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.409967207 V-1     T = -25 °C: 4.778312825 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.511032479 V-1     T = -25 °C: 9.677105929 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67085857 V-1     T = -25 °C: 15.27378636 V-1
Break-through voltage: T = +20 °C: 405.8496361 V     T = -25 °C: 370.2376297 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:45:32 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:00:58 CET jreher Updated box and position via API.
18. Dec 2020 14:01:21 CET jreher Updated box and position via API.
11. Aug 2020 18:05:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:29 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:17 CET jreher Updated APD location via API.
25. Nov 2019 17:18:44 CET jreher Updated box and position via API.
20. Aug 2019 12:44:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.