RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032219 - Archived data from Thu, 15. April 2021 17:00:50 CEST


This is all the information about APD 2818032219. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032219
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 11
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8923757 V     T = -25 °C: 343.6436387 V
Voltage for Gain 150: T = +20 °C: 386.7350878 V     T = -25 °C: 350.9979619 V
Voltage for Gain 200: T = +20 °C: 391.104393 V     T = -25 °C: 355.1251758 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.663401901 V-1     T = -25 °C: 4.738871284 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.241751551 V-1     T = -25 °C: 9.549896287 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.40524429 V-1     T = -25 °C: 15.10705276 V-1
Break-through voltage: T = +20 °C: 406.5109348 V     T = -25 °C: 370.227032 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:19 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:58 CET jreher Updated box and position via API.
11. Aug 2020 18:05:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:29 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:17 CET jreher Updated APD location via API.
25. Nov 2019 17:18:44 CET jreher Updated box and position via API.
20. Aug 2019 12:44:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:40 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.