RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032217 - Archived data from Fri, 05. February 2021 11:00:58 CET


This is all the information about APD 2818032217. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032217
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 14.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 9
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8844189 V     T = -25 °C: 343.7663593 V
Voltage for Gain 150: T = +20 °C: 386.6539241 V     T = -25 °C: 351.0556687 V
Voltage for Gain 200: T = +20 °C: 390.9675097 V     T = -25 °C: 355.1382595 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.687722929 V-1     T = -25 °C: 5.057166027 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.364386712 V-1     T = -25 °C: 9.537443487 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67440446 V-1     T = -25 °C: 15.14302505 V-1
Break-through voltage: T = +20 °C: 405.4774389 V     T = -25 °C: 369.3838692 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:27 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:52 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:58 CET jreher Updated box and position via API.
11. Aug 2020 18:05:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:28 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:17 CET jreher Updated APD location via API.
25. Nov 2019 17:18:43 CET jreher Updated box and position via API.
20. Aug 2019 12:44:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.