Subdetector specification:  
Serial: 2818032215
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 8
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6426799 V     T = -25 °C: 344.4393905 V
Voltage for Gain 150: T = +20 °C: 387.4710204 V     T = -25 °C: 351.8015367 V
Voltage for Gain 200: T = +20 °C: 391.8336194 V     T = -25 °C: 355.9274208 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419924916 V-1     T = -25 °C: 4.782880354 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.61034455 V-1     T = -25 °C: 9.745089256 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85726095 V-1     T = -25 °C: 15.53778715 V-1
Break-through voltage: T = +20 °C: 407.4785167 V     T = -25 °C: 371.2236545 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:12 CET jreher Assigned to capsule by script
05. Feb 2021 11:00:58 CET jreher Updated box and position via API.
18. Dec 2020 13:59:52 CET jreher Updated box and position via API.
11. Aug 2020 18:05:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:28 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:17 CET jreher Updated APD location via API.
25. Nov 2019 17:18:43 CET jreher Updated box and position via API.
20. Aug 2019 12:44:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.