Subdetector specification:  
Serial: 2818032213
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.6 V
Dark current: 10.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 6
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.6835747 V     T = -25 °C: 341.6387021 V
Voltage for Gain 150: T = +20 °C: 384.4380832 V     T = -25 °C: 348.8935152 V
Voltage for Gain 200: T = +20 °C: 388.7583119 V     T = -25 °C: 352.9550625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.433888475 V-1     T = -25 °C: 4.770939874 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.69657046 V-1     T = -25 °C: 9.783564097 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05767796 V-1     T = -25 °C: 15.65233521 V-1
Break-through voltage: T = +20 °C: 404.2209834 V     T = -25 °C: 367.9807702 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:00:57 CET jreher Updated box and position via API.
11. Aug 2020 18:05:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:28 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:56 CET jreher Updated APD location via API.
27. Nov 2019 19:46:16 CET jreher Updated APD location via API.
25. Nov 2019 17:18:43 CET jreher Updated box and position via API.
20. Aug 2019 12:44:24 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.