RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2818032209 - Archived data from Tue, 11. August 2020 18:05:06 CEST


This is all the information about APD 2818032209. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2818032209
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 98
Position in Box: 3
EP1 batch: 93
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1625578 V     T = -25 °C: 344.8749389 V
Voltage for Gain 150: T = +20 °C: 388.0019476 V     T = -25 °C: 352.2391432 V
Voltage for Gain 200: T = +20 °C: 392.3710546 V     T = -25 °C: 356.3714823 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.568506824 V-1     T = -25 °C: 4.984497138 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.008501178 V-1     T = -25 °C: 9.314190513 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01057684 V-1     T = -25 °C: 14.72826004 V-1
Break-through voltage: T = +20 °C: 406.9701306 V     T = -25 °C: 370.7842364 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:39 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:00:57 CET jreher Updated box and position via API.
11. Aug 2020 18:05:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:28 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:55 CET jreher Updated APD location via API.
27. Nov 2019 19:46:16 CET jreher Updated APD location via API.
25. Nov 2019 17:18:43 CET jreher Updated box and position via API.
20. Aug 2019 12:44:23 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:39 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:55 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:19 CEST Tobias Imported from Hamamatsu datasheet.