RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2817032163 - Archived data from Tue, 11. August 2020 18:05:01 CEST


This is all the information about APD 2817032163. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2817032163
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 97
Position in Box: 29
EP1 batch: 92
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4781638 V     T = -25 °C: 346.0811067 V
Voltage for Gain 150: T = +20 °C: 389.3195054 V     T = -25 °C: 353.4017133 V
Voltage for Gain 200: T = +20 °C: 393.6739702 V     T = -25 °C: 357.5020359 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419569915 V-1     T = -25 °C: 4.928765607 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.708650924 V-1     T = -25 °C: 9.183798468 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17458735 V-1     T = -25 °C: 16.52810178 V-1
Break-through voltage: T = +20 °C: 409.1930497 V     T = -25 °C: 372.6582106 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:14:20 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:09 CEST jreher Updated box and position via API.
05. Feb 2021 11:00:52 CET jreher Updated box and position via API.
11. Aug 2020 18:05:01 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:55:26 CEST jreher Updated APD location via API.
17. Feb 2020 17:50:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:54 CET jreher Updated APD location via API.
27. Nov 2019 19:46:07 CET jreher Updated APD location via API.
25. Nov 2019 17:18:40 CET jreher Updated box and position via API.
23. Aug 2019 10:15:30 CEST spankonin Updated APD batch assignment via API.
20. Aug 2019 12:44:07 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:54 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:18 CEST Tobias Imported from Hamamatsu datasheet.