Show Hamamatsu Avalanche Photo Diode 2817032160 - Archived data from Thu, 03. January 2019 00:13:54 CET
This is all the information about APD 2817032160. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2817032160 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E08 |
Break-through voltage: | 406 V |
Voltage for Gain 100 (T=+25°C): | 378.1 V |
Dark current: | 6.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 97 |
Position in Box: | 26 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
26. Oct 2021 15:12:35 CEST | oafedulidis | Assigned to capsule by script |
03. May 2021 15:20:24 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:00:52 CET | jreher | Updated box and position via API. |
11. Aug 2020 18:05:00 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:55:25 CEST | jreher | Updated APD location via API. |
17. Feb 2020 17:50:53 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 11:50:54 CET | jreher | Updated APD location via API. |
27. Nov 2019 19:46:07 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:18:40 CET | jreher | Updated box and position via API. |
23. Aug 2019 10:15:30 CEST | spankonin | Updated APD batch assignment via API. |
20. Aug 2019 12:44:06 CEST | jgrochowski | Updated APD batch assignment via API. |
05. Jul 2019 13:49:09 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:13:54 CET | Tobias | Corrected dark current unit. |
20. Jun 2018 13:36:18 CEST | Tobias | Imported from Hamamatsu datasheet. |